Outsource MEP
Building Information Modeling (BIM) Services
MEP BIM
Modeling Services are
becoming more popular in the construction industry. The MEP BIM Model is a 3D
model of the mechanical, electrical, and plumbing systems that are part of a
building. It includes all the pipes, ducts, and wires that make up these
systems. MEP BIM models can include any combination of equipment; from simple
to complex.
MEP BIM is a
methodology that uses a series of design drawings and 3D models to accelerate
project planning, design, implementation, construction and commissioning. It
also allows for efficient use of resources during the project lifecycle.
Construction project management teams need to be able to produce a series of
one-page construction drawings, 3D models, and quick sketches. These drawings
are the basis for all communication between the construction team and various
stakeholders, including engineers, architects and owners.
MEP BIM
allows for efficient use of resources during the project lifecycle by
eliminating redundant activities such as The advantages are that MEP BIM
reduces the amount of time required to complete construction phases by up to
80% while saving on costs and increasing the quality of the project. W. Richard
Stevens, the author of BIM-Based Design: The Future of Architecture, has
written extensively about the best practices for BIM. This includes means that
MEP BIM allows for efficient use of resources during the project lifecycle by
eliminating redundant activities such as The advantages are that MEP BIM
reduces the amount of time required to complete construction phases by.
MEP BIM
stands for ‘mechanical, electrical and plumbing engineering’s with ‘building
information modeling’. The methodology is used for building projects and
consists of the following phases: – Project planning. – Design. –
Implementation and construction. – Commissioning (start of operations).
The project plan will be made on the basis of the building project goals,
constraints and risks. – The design phase will be based on the project plan and
will include; conceptual, structural and functional architectural design. –
This phase also includes documentation of information needed for construction
such as drawings. – Construction is defined as those activities related to
building operations. – Commissioning will involve the completion of all
activities necessary to bring the building to a fully operational state. The
construction phase will include; detailed design, fabrication and installation
of the building. – Commissioning will involve all activities necessary to bring
the project to a fully operational state. – Construction management is defined
as control of all activities related to construction such as budgeting,
scheduling and procurement.
This is
a significant advantage over building design models that are 2D.MEP BIM
modeling was developed for ease of use and the elimination of mistakes made
during design by using a single file, but it wasn’t until recently that MEP BIM
modeling has become more accepted in the construction industry. Primary
functions of the MEP function are:
To
provide appropriate and adequate infrastructure for the design and construction
of buildings for various purposes and in various locations.
To
provide safe, healthy, energy efficient living environments as well as to
protect people from falling objects due to improper design or construction
activities.
To
provide access for emergency vehicles and equipment. Design and construction of
buildings for various purposes and in various locations.
It has
been said that, “It is impossible to create a mistake in BIM that is larger
than the project “This can be attributed to the fact that MEP and precise 3D
modeling are mathematically compatible. The lack of restrictions on design
models and the ability to create a construction process that is more efficient
was one of the key factors in developing BIM architecture. BIM’s ability to
model a change in the construction process, such as the addition or removal of
a wall, can be better than traditional processes. This is because BIM can be
changed at any point in time using a computer with minimal errors which are
generated by human error. For example, if there is an error in measuring angles
on an angle bracketing, a software error can be generated and the angles
measured again.
MEP Global Engineering provides MEP BIM Modeling Services:
MEP
Building Information Modeling (BIM) Services
MEP BIM
Services
BIM
Coordination
MEP 3D
Modeling
MEP Shop
Drawings
Revit
MEP Services
Pipe
Spool Drawings
BIM
Implementation
BIM
Integration
BIM
Analysis
Virtual
Construction
BIM
Content Creation
BIM
Transition Support
Brief
Design & Design preparation
MEP BIM
Services
Revit
MEP services
BIM
Analysis
BIM
Coordination
Pipe
Spool Drawings
Virtual
Construction
MEP 3D
Modeling
BIM
Implementation
BIM
Content Creation
MEP Shop
Drawings
BIM
Integration
BIM
Transition Support
We Follow the Following International Standards:
IECC –
International Energy Conservation Code
NFPA
codes – National Fire Protection Association codes
AS1851-2005
– Australian Standards for Maintenance of fire protection systems and equipment
NBN
standards – S21-200, S21-201, S21-202, S21-203, N S21-207
ASHRAE
standards – The American Society of Heating, Refrigerating and Air Conditioning
Engineers standards
AS
1668.2 – Australian Standards for The use of mechanical ventilation and air
conditioning in buildings
AS/NZS
3666 – Joint Australian New Zealand Standard
Request and Free Quote on info@mepglobalengg.com for your MEP